ACI Concrete Transportation Inspector Exam 2026 – Complete Practice Test

Session length

1 / 400

Which item is not typically listed on the load ticket?

Mix design, batch time, and pour location

Batch number

Temperature reading

Weather forecast

Load tickets capture the essential details of a concrete batch to ensure proper traceability, placement, and quality. They include the mix design so the batch proportions match the specification, the batch time to establish the concrete’s age for placement and testing, the pour location to guide where the concrete will be placed, the batch number to link to the exact batch record and materials used, and a temperature reading because temperature affects workability, setting, and strength development. These items are all directly tied to the concrete being poured. A weather forecast is useful for planning and protecting the pour, but it does not describe the specific batch or placement details, so it isn’t normally listed on the load ticket.

Next Question
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy